For Owners & Developers

De-risk your projects before the first shovel hits the ground

AI-powered plan review catches coordination conflicts, code issues, and costly errors — so you can build with confidence.

Minutes turnaround
All disciplines reviewed
10,000+ sheets supported

5+ issues or full refund • Results in hours

Trusted by 500+ companies including

187K+ issues caught$50K+ avg value found per project

Architects · Engineers · GCs · Developers · Owner's Reps · Plan Checkers · Insurance

ProStruct Engineering
Solorio, Inc.
CBA Architects
Structural Workshop
Existing Building
Kirksey Architecture
Cagley
AP Fabrications
Columbia Construction
BDCL Architects
Structural Forensic Experts
DGen Energy
X Engineering
Concrete Frame
Becker Frondorf
Arrowstreet
Kovacs Consulting Group
Tierney LLC
Tricar
Flint Engineering
Eden Housing
Fyffe Construction
Well Done 1 Kit Homes
ProStruct Engineering
Solorio, Inc.
CBA Architects
Structural Workshop
Existing Building
Kirksey Architecture
Cagley
AP Fabrications
Columbia Construction
BDCL Architects
Structural Forensic Experts
DGen Energy
X Engineering
Concrete Frame
Becker Frondorf
Arrowstreet
Kovacs Consulting Group
Tierney LLC
Tricar
Flint Engineering
Eden Housing
Fyffe Construction
Well Done 1 Kit Homes
Lennar
SOM
IMEG Corp
Martin/Martin
Huckabee
Molba Construction
Nexstar Homes
Sciensus USA
AdobeInc
IDA Structural Engineer
Loma Architecture
PE-SE
Bradford Building
TDG Inc
Unum Collab
Sound Structures
Lennar
SOM
IMEG Corp
Martin/Martin
Huckabee
Molba Construction
Nexstar Homes
Sciensus USA
AdobeInc
IDA Structural Engineer
Loma Architecture
PE-SE
Bradford Building
TDG Inc
Unum Collab
Sound Structures
CSHQA
SpecSF
TNP Inc
Centerline
Wadman
Dalton Architects
Opening Tech
Viking Construction
Lead LLC
J. Fisher & Co
Miller Remick
ADCI Design
Arcca GP
Seth Structural
Zeltmatcher
WRC Consulting
LCG MEP
Hergonsa
McKinley Delivers
SFLA
Hero X Airdomes
ALF FL
Get Provision
Concept AZ
Lamontara
CSHQA
SpecSF
TNP Inc
Centerline
Wadman
Dalton Architects
Opening Tech
Viking Construction
Lead LLC
J. Fisher & Co
Miller Remick
ADCI Design
Arcca GP
Seth Structural
Zeltmatcher
WRC Consulting
LCG MEP
Hergonsa
McKinley Delivers
SFLA
Hero X Airdomes
ALF FL
Get Provision
Concept AZ
Lamontara

Owners pay for mistakes they didn't make

The hidden cost of drawing errors

5-10%

of project budgets lost to rework from drawing coordination errors

$15-25K

average cost per change order including delays and overhead

52%

of commercial projects exceed their original budget

100-200

issues InspectMind catches per project on average

Sources: FMI Research, ENR/Autodesk Construction Data, McKinsey Construction Report

Protect your investment at every stage

From due diligence to closeout — catch issues before they become budget busters.

Fewer Change Orders

Catch coordination conflicts and spec mismatches before they become expensive change orders.

Predictable Budgets

No more surprise costs from drawing errors. Know what you're building before ground breaks.

On-Schedule Delivery

Prevent delays caused by RFIs and rework. Keep your projects on track.

Reduced Risk Exposure

Document issues early. Protect yourself from contractor claims and cost disputes.

When to use it

Build better at every project milestone.

Pre-Construction Due Diligence

Review IFC sets before signing the GMP. Identify risks that could blow your contingency.

  • Risk identification
  • Informed negotiations
  • Budget protection

Design Phase QA/QC

Review drawings at each design milestone. Catch issues while changes are cheap.

  • Early issue detection
  • Design quality assurance
  • Scope clarity

Portfolio Standardization

Apply consistent QA/QC standards across all your projects.

  • Consistent quality
  • Scalable process
  • Institutional knowledge

How it works for owners

From upload to actionable insights in days, not weeks.

01

Share the drawings

Have your GC, architect, or owner's rep upload the latest plan set.

02

AI reviews everything

Our AI cross-checks all documents for coordination conflicts and code violations.

03

Review & resolve

Get a prioritized issue report. Share with your team to drive resolution.

"InspectMind helped us catch real meaningful issues. Using it early in the process is going to absolutely help out in the field. For temperature-controlled facilities, this kind of AI-driven QA/QC is incredibly valuable."

A

Aaron Bass

Director of Construction, Cold Summit Development

ROI Calculator

See what one check saves you

Based on real data from 2,800+ projects and 58,000+ issues found.

Your project details

$5.0M
$500K$100M
200
202,000

InspectMind cost

Up to 250 sheets · flat

$250

InspectMind

$250

One RFI

$3,500

One rework

$15,000

Estimated savings

Issues found

~140

20 Critical74 High46 Medium

Critical issues caught

Code violations, structural conflicts, rework avoided

$120K

High-severity issues caught

RFIs prevented, coordination clashes resolved

$52K

Medium issues caught

Drawing gaps, specification clarifications

$7K
Total estimated savings$179K
Return on investment

$250 investment → $179K saved

715x

One critical issue caught pays for 60 checks. Even the most skeptical estimate shows massive ROI — because catching problems in design costs 10–100x less than fixing them in the field.

Start free first check

5+ issues found or full refund guaranteed

How we calculate savings

Issue count: ~70 issues per 100 drawing sheets — our real average across 2,800+ completed projects.

Severity split: 14% Critical / 53% High / 33% Medium — from 58,000+ real issues exported from our production database.

Savings model: We estimate what fraction of issues at each severity would have caused a costly downstream problem (RFI, change order, rework) if not caught during design review. We use conservative "escape rates" — 40% for Critical, 20% for High, 10% for Medium — well below industry rework benchmarks (CII: 5–10% of project value).

Cost per escaped issue: Critical $10K–$50K (scales with project value — rework on a $50M project costs more than on a $1M project), High $2K–$8K (RFI + delay), Medium $1.5K (minor rework). Based on CII, FMI, and Navigant construction industry research.

Frequently Asked Questions

After plans are reviewed

Stay on top of what's actually built

Field Reports gives owners and reps an independent QA overlay — daily logs, observations, and condition reports captured by your team or your reps, in your template.

Explore Field Reports for Owners

Ready to de-risk your next project?

Get an issue report in days, not weeks. Issue guarantee included.