AI Plan Checking for Contractors
Catch conflicts and code issues before they hit the field. Review full plan sets in days, not weeks.
5+ issues or full refund · Results in hours · Files encrypted & deleted on request
Trusted by 500+ companies including
Architects · Engineers · GCs · Developers · Owner's Reps · Plan Checkers · Insurance
Average: 127 issues found per project
The Problem for General Contractors
Construction coordination issues cost you money
5-10%
of project budget lost to rework from drawing errors
40-60
average RFIs per project from coordination gaps
$5,000+
average cost per RFI when delays are factored in
100-200
issues InspectMind catches per project on average
Sources: FMI Research, Autodesk/Dodge Construction Data, InspectMind analysis of 500+ projects
Why GCs Use InspectMind
Catch issues before they become expensive problems.
Protect Your Margins
Rework costs 5-10% of project budgets. Catch issues before they erode your profit.
Catch Issues Early
Find conflicts, mismatches, and code violations before they become change orders.
Fewer RFIs
Identify issues that would generate RFIs before breaking ground.
Results in Hours
Get a prioritized issue list in hours. No waiting weeks for consultant review.
When to Use It
From bidding to closeout—stay ahead of issues at every stage.
Win More Bids
Walk into owner interviews showing: 'We found 300 issues on your drawings—here's what we already understand.' Demonstrate document mastery that justifies your pricing and builds trust before you're even selected.
- Stand out from competition
- Justify your pricing
- Build owner trust
Bidding & Preconstruction
Review IFC sets before bidding. Identify risks, scope gaps, and coordination issues that affect your estimate. Price with confidence, not surprises.
- Accurate bids
- Risk identification
- Scope clarity
Start of Construction
Review before mobilization. Catch issues that would cause delays and rework. Start clean, not chasing problems.
- Prevent field conflicts
- Reduce RFIs
- Smooth start
Revision Review
Review ASIs and revised drawings. Identify changes and new conflicts quickly. Don't let addenda slip through.
- Change tracking
- Impact analysis
- Fast turnaround
"InspectMind helped us catch real meaningful issues. Using it early in the process is going to absolutely help out in the field. For temperature-controlled facilities, this kind of AI-driven QA/QC is incredibly valuable. It immediately caught real issues like wood vs HDPE blocking conflicts and specs vs drawings mismatches."
Aaron Bass
Director of Construction, Cold Summit Development
Relevant Checkers for GCs
Specialized AI reviews for contractor workflows.
Simple, transparent pricing
Pay per check. All disciplines included. No per-user fees.
500+ sheets at $1/sheet drawings, $0.25/page specs. Full pricing →
Running 10+ checks/month?
What the AI Does (and Doesn't Do)
Setting the right expectations
What InspectMind Does
- AI-powered design review and compliance checking
- Cross-discipline coordination issue detection
- Code non-compliance identification (IBC, ADA, fire/life safety)
- Missing or inconsistent information flagging
- Constructability risk detection
- Spec vs drawing conflict identification
- Structured comment tracker with severity ratings
- Revision tracking—verifies if previous comments are resolved
What InspectMind Doesn't Do
- —Generate design—AI reviews only, design responsibility stays with consultant of record
- —Replace stamped engineering calculations
- —Provide final code approval (use alongside AHJ review)
- —Replace your QA/QC team—it augments, not replaces
For calculations: We check consistency between calculations and drawings, flag unrealistic assumptions, and identify sizing inconsistencies—but don't replace engineering calcs.
See what one check saves you
Based on real data from 2,800+ projects and 58,000+ issues found.
Your project details
InspectMind cost
Up to 250 sheets · flat
InspectMind
$250
One RFI
$3,500
One rework
$15,000
Estimated savings
~140
Critical issues caught
Code violations, structural conflicts, rework avoided
High-severity issues caught
RFIs prevented, coordination clashes resolved
Medium issues caught
Drawing gaps, specification clarifications
$250 investment → $179K saved
715x
One critical issue caught pays for 60 checks. Even the most skeptical estimate shows massive ROI — because catching problems in design costs 10–100x less than fixing them in the field.
5+ issues found or full refund guaranteed
How we calculate savings
Issue count: ~70 issues per 100 drawing sheets — our real average across 2,800+ completed projects.
Severity split: 14% Critical / 53% High / 33% Medium — from 58,000+ real issues exported from our production database.
Savings model: We estimate what fraction of issues at each severity would have caused a costly downstream problem (RFI, change order, rework) if not caught during design review. We use conservative "escape rates" — 40% for Critical, 20% for High, 10% for Medium — well below industry rework benchmarks (CII: 5–10% of project value).
Cost per escaped issue: Critical $10K–$50K (scales with project value — rework on a $50M project costs more than on a $1M project), High $2K–$8K (RFI + delay), Medium $1.5K (minor rework). Based on CII, FMI, and Navigant construction industry research.
Frequently Asked Questions
Related Resources
Learn more about reducing RFIs and protecting margins
Daily logs and punch lists, drafted in minutes
Walk the site, dictate findings, snap photos. Field Reports drafts daily logs and punch lists in your firm's template — pushes to Procore and Smartsheet.
Ready to Catch Issues Before They Cost You?
Upload drawings and get issues with evidence in hours. Start with a free first check.
Not sure? Run it on a completed project you already know — see what we catch.
Start free first check5+ issues guaranteed or full refund · No sales call required